The judgement: acceptance rests on heat treatment evidence, not one hardness number
P91 fittings sit on high-temperature pressure parts in power plants, and the quality problems concentrate in heat treatment rather than in outside diameter, wall thickness or bevel. That gives a rule a buyer can act on: build acceptance around process evidence plus test evidence, fixing the heat treatment record, the method and location of hardness testing, and the metallographic and mechanical test items. A single sentence saying hardness shall comply does not survive execution and does not close a dispute.
Hardness needs its place set correctly. It is an indirect reading of what heat treatment did: the number moves with the test method, the location on the part and the surface condition. A reading inside a range does not by itself establish structure or mechanical properties. A reading outside it is a clear signal worth tracing back through the heat number to the process record. Hardness belongs in the specification. It cannot be the whole of the specification.
Four documents, four jobs, cited separately
A P91 power piping specification usually carries four standards at once, and they do not do the same work. Compressed into "as per current standards", they stop matching the clauses at acceptance.
| Number | Title | What it governs | Issued | Effective | Status |
|---|---|---|---|---|---|
| DL/T 438-2023 | Metal technical supervision code for fossil-fuel power plants | Scope of supervision, requirements, inspection items, content and criteria | 2023-10-11 | 2024-04-11 | Current |
| DL/T 695-2025 | Steel buttwelding fittings for power stations | The fitting as a product | 2025-09-28 | 2026-03-28 | Current |
| GB/T 5310-2023 | Seamless steel tubes for high-pressure boilers | Steel tube | 2023-09-07 | 2024-04-01 | Current |
| ASTM A335/A335M | Seamless ferritic alloy-steel pipe for high-temperature service | High-temperature seamless alloy pipe | Page version -24 | Not listed | Per contract |
Three points follow. DL/T 438-2023 is an industry standard administered by the National Energy Administration, replacing DL/T 438-2016 in full, and it sits on the supervision side: it sets the scope of supervision, the requirements, the inspection items, content and criteria, and it does not replace a product standard. DL/T 695-2025 lands on the fitting as a product and takes effect only on 2026-03-28, so a project crossing that date states both the edition and the effective date in its technical agreement. GB/T 5310-2023 has been effective since 2024-04-01 and addresses steel tube; fittings and tubes are cited to different standards, and the number on a material certificate has to match its own object. For ASTM A335/A335M the public page version is -24 and the register entry lists no issue or effective date, so nothing is filled in here and the version named in the contract governs.
Why one hardness figure is not a specification: method, location, condition
Three variables have to be fixed before a hardness value holds up at acceptance.
Method comes first. Portable and bench hardness testers work on different principles and conditions, and their readings should not simply stand in for one another; the document names the test method, or names whose result governs. Location comes next. The fitting body, the area near the bevel, the weld and the heat-affected zone are not the same object, and acceptance locations are listed one by one. Condition comes last. Surface finish, curvature, preparation at the indentation and coupling all move the reading, and the record should keep that information so a re-test can reproduce it.
Without those three fixed, a value written down in detail still cannot be judged. As for the upper and lower hardness limits, the temperature and time parameters of heat treatment, and the acceptance level for microstructure, these are clause content and no figures are reproduced here. The hardness and metallographic requirements that DL/T 438-2023 sets for 9%Cr components, the family P91 belongs to, are checked against the original text before they go into a technical agreement.
Writing those three down also leaves a path for a dispute: which method applies and in what order to the first test, the re-test and a referee test, and which record counts as the basis. Without that order the argument starts on the reading, moves to the edition, and only then reaches the heat number.
Seven acceptance items for the purchase specification
Ordered from material to documentation, these seven work as the skeleton of an annex.
- Material and cited standards: the P91 grade, product standard number and year in full, tube and fitting cited separately, no shorthand that drops the year.
- Delivery condition: supplied in the heat-treated condition, with the process set by the manufacturer's process documents, whose submission scope and copy count are agreed in the contract.
- Heat treatment record: per heat number, the charge arrangement, temperature and time records, and furnace and instrument information, each tied to its heat number.
- Hardness testing: method, location, sampling proportion and re-test rules all written out, with limits cited by clause rather than copied in as figures.
- Metallography and mechanical properties: items as the product standard and supervision code require, with the specific requirements for 9%Cr components checked against the original DL/T 438-2023 text.
- Non-destructive testing and dimensions: items, proportions and acceptance levels as the contract and design documents require.
- Marking and traceability: the heat number agreeing across the body marking, the material certificate, the heat treatment record and the test report.
Item four is often shrunk to "hardness acceptable". Leave out the sampling proportion and the re-test rule, and at incoming inspection one side fails the lot while the other passes it, with no shared starting point. Item five drifts the other way, into a process instruction that moves the manufacturer's process responsibility onto the buyer: an acceptance document says what is inspected, against which criteria, and which records are handed over.
Incoming inspection: three checks that get missed
Heat number continuity is the one most often skipped. Heat treatment runs by heat, so the hardness, metallographic and mechanical reports all have to return to one heat; where the number breaks between reports, the trace breaks with it.
Re-test basis is the next. A re-test uses the same method and the same locations as the first test, equipment included; on a different basis the two data sets cannot be compared and the dispute does not converge.
Edition against criteria follows. DL/T 695-2025 takes effect on 2026-03-28 and GB/T 5310-2023 has been effective since 2024-04-01, so a contract crossing either date states which edition it is accepted against, and the criteria point at specific clauses instead of a bare standard number.
Putting the requirement on every line item
Fittings on one P91 requisition may go to main steam, hot reheat and cold reheat lines. Under the published scope of DL/T 438-2023, pressure parts are sorted by working temperature and working pressure: carbon steel at 400 °C and above and alloy steel at 450 °C and above form one item, other pressure parts at 5.9 MPa and above form another, and cold reheat steam piping with longitudinal welds carries its own limit of 300 MW and above. Line data therefore goes on each line, not once per fitting size.
Standard number, line data, material, and inspection with documentation: four fields per line item beat one note at the end of the file. To confirm product range and supply form, start from the power plant piping parts page, check the quality page for inspection and documentation notes, then send line data and data sheets through the inquiry page.
Sources
Need a quote for the products mentioned in this article?
Submit your specs and our pressure piping team will respond within one business day.
Send RFQQuote in 4 hours
Products covered in this article
Sourcing any of these? Send the spec and our pressure-piping desk replies within 4 business hours.
Related reading
Technical15CrMoG and 12Cr1MoVG Fittings vs WP11 and WP22: Limits of Cr-Mo Grade Matching
No one-to-one mapping links the GB/T 5310-2023 boiler tube grades to A234/A234M fitting grades such as WP11 and WP22. Where it holds, where it stops, and what to record.
TechnicalChinese 20# and Q355B Fittings vs ASTM A234 WPB: What to Check Item by Item
Comparing 20# and Q355B with ASTM A234 WPB is not a grade-equivalence question. A clause-by-clause checklist for scope, chemistry, properties and heat treatment.
TechnicalBubble Emission vs Hydrostatic Leak Testing for Fittings
Choose between ASTM E515 bubble emission and ASTM E1003 hydrostatic leak testing for fittings: principles, sensitivity, and procurement checks.



