기술ASME B16.49 Induction Bend Inspection and Procurement Guide
Understand the scope of ASME B16.49 for factory-made induction bends, what to check during procurement and inspection, and what to verify when the standard does not apply.
인사이트
압력 배관 부품, 플랜지 및 단조 피팅에 관한 기술 자료, 규격 비교, 프로젝트 사례, 구매 가이드를 제공합니다.
Google로 찾으셨나요? ASTM/ASME 피팅 견적을 4 시간 내 회신.
견적 요청293개 기사
기술Understand the scope of ASME B16.49 for factory-made induction bends, what to check during procurement and inspection, and what to verify when the standard does not apply.
사례 연구Explore the Gas Growth Integrated Project (GGIP) in Iraq—a multi-energy initiative by TotalEnergies, Basrah Oil Company, and QatarEnergy. This reference covers project scope, procurement considerations for piping and water systems, and key checks for EPC engineers and buyers.
업계 뉴스Shell's December 2024 investment decision for Bonga North and its 2025 agreement to increase its interest in OML 118 are key updates for EPC suppliers. This article clarifies what is confirmed, what remains to be verified, and how buyers can align their piping procurement strategies with deep-water project developments.
구매 가이드Compare ASME B16.20 metallic and B16.21 nonmetallic flat gaskets, and clarify what each standard actually covers before you issue an RFQ.
표준ASME B16.11 defines Class 2000, 3000, 6000 for threaded fittings and Class 3000, 6000, 9000 for socket-weld fittings. This guide explains what these classes mean, how to specify them, and what to verify when procuring forged fittings.
기술Understand the difference between ASME B16.52 for nonferrous forged fittings and ASTM B283/B283M for copper alloy die forgings, plus RFQ and inspection guidance.
사례 연구Explore the Amiral petrochemical complex project in Saudi Arabia as a reference for piping procurement. Learn about the project scope, key considerations for EPC buyers, and how to apply these insights to your own sourcing strategies.
업계 뉴스ADNOC's Ruwais LNG project, a 9.6 mtpa clean-power facility, has awarded critical equipment contracts worth over $400 million, including 75 MW electric motor-driven compressors. For EPC buyers, this signals a shift toward electrified liquefaction and new procurement considerations.
구매 가이드Use this RFQ checklist to specify ASME B16.10 valve face-to-face dimensions correctly and avoid installation mismatches in your piping system.