Wawasan

Pusat Wawasan & Pengetahuan

Artikel teknis, perbandingan standar, studi kasus proyek, dan panduan pembelian tentang komponen perpipaan bertekanan, flensa, dan fitting tempa.

Menemukan kami via Google? Dapatkan penawaran ASTM/ASME dalam 4 jam.

Kirim RFQ

297 artikel

水暖管件.jpgStandar
Standar

ASME B16.3 Malleable Iron Threaded Fittings: Scope and Classes

ASME B16.3 covers malleable iron threaded fittings in Classes 150 and 300, including ratings, dimensions, threading, and coatings. This guide explains the standard's scope, key requirements, and procurement checks for EPC engineers and buyers.

27 Sep 20266 menitHebei Haihao Group
6米立车.JPGStudi kasus
Studi kasus

Whale Starts Production: A Standardized Deepwater Design Reference

Shell's Whale project in the U.S. Gulf of Mexico began production in January 2025, showcasing a standardized design approach. This case study explores the implications for EPC engineers and procurement managers, focusing on how standardization can influence piping system procurement and project execution.

25 Sep 20266 menitHebei Haihao Group
法兰管件图.jpgStandar
Standar

ASME B16.14 Pipe Plugs, Bushings and Locknuts Explained

ASME B16.14 covers ferrous pipe plugs, bushings, and locknuts with pipe threads, including ratings, dimensions, materials, and marking. This guide explains the standard's scope, key differences from ASME B1.20.1, and what buyers must verify to avoid specification errors.

22 Sep 20266 menitHebei Haihao Group
8字盲板 (2).jpgTeknis
Teknis

Flange Facing and Gasket Compatibility Checklist

ASME publishes separate standards for metallic and nonmetallic gaskets. This checklist helps buyers cross-check gasket type, flange facing, and procurement details before issuing an RFQ.

21 Sep 20265 menitHebei Haihao Group
化工厂.jpgBerita industri
Berita industri

Whiptail Approval Adds a Sixth Stabroek Development to Guyana's Offshore Buildout

ExxonMobil has received government and regulatory approvals for the Whiptail development, the sixth project on the Stabroek block offshore Guyana. The project targets about 250,000 barrels per day of capacity by end-2027, with $12.7 billion investment. For EPC buyers, this signals continued demand for subsea and topside piping components.

19 Sep 20265 menitHebei Haihao Group